Patents
- Patent granted vide No. 340907 for application number-1494/DEL/2013 filed with Indian Patent Office, New Delhi, India, First examination report was submitted on 16th November 2018 “A Novel Method and System of Capacitor Voltage Balancing for Three-Phase Neutral Point Clamped Bi-directional Rectifiers – Hamid Langer Modulation Strategy”
- Patent Filed: Rakesh Kumar Jha, Sanjeev Singh, “Software Defined Heterogeneous Network”. Reference Number: E-2/788/2016-DEL
Sponsored Research
S. No |
Project title |
Funding Agency |
1. |
Home automation system (A retrofit device capable of automating switchboard with utmost convenience. High load bearing capacity ≈ 10KW with response time of ≈ 200ms) |
VIT Vellore. which is now a startup named “AlisteTechnology”- Home automation system |
Development Activities
Product development:
- “Capacitor Voltage Balancing for Three-Phase Neutral Point Clamped Bi-directional Rectifiers”- Patent was filled in 2013 and given application number-1494/DEL/2013 filed with Indian Patent Office, New Delhi, India. First examination report for this application was filled in 16/11/2018.
- “Three phase to single phase transformer”- MOU agreement with M/S VH Group, S. No. 114/A/2, Venkateshwara House, Pune-411030,
- “Reliable Electrical Shock Protection” – Mutual agreement with M/S VH Group, S. No. 114/A/2, Venkateshwara House, Pune-411030
- “Static Solar Tracker” –Non-disclosure agreement with M/S VH Group, S. No. 114/A/2, Venkateshwara House, Pune-411030.
- NIT Srinagar and Faculty of EED MBSCET agreed to take up B.Tech final year project jointly associating one faculty and three students from each institute.
Consultancy Activity
S. No |
Project Title |
Duration |
Funding Agency |
1. |
Earth mat design for 2×3.5 MVA electric substation for power supply arrangements of T-80 tunnel at Bhanihal |
5 Years |
IRCON International Ltd. Jammu |
2. |
Short circuit calculation for 2x1MVA & 2×1.5 MVA 33KV/433V substation |
1.5 Years |
IRCON International Ltd. Jammu |
3. |
Street lighting design for Bhalla Enclave |
1 month |
B.M Energy systems and consultants. Jammu |
4. |
Load study and its variation |
3 months |
IRCON International Ltd. Jammu |
5. |
Lighting design and wiring layout |
1 month |
B.M Energy systems and consultants, Jammu |
6. |
Verification and validation of road lighting |
5 months |
M&RE Circle-II, Srinagar |
7. |
Lighting design for Uflex Holography |
2 weeks |
B.M Energy systems and consultants, Jammu |